The AWK documents a facility’s waste-related processes and ensures transparency regarding the waste generated, quantities and disposal routes. At the same time, it helps companies to organise their waste management more efficiently and identify opportunities for optimisation. Interzero supports companies throughout Austria in drawing up legallymore compliant and practical waste management strategies.
In a nutshell
- A waste management plan is required by law for facilities which generate waste during their operations and which employ more than 20 staff members.
- The concept sets out waste streams, organisational measures and future developments.
- It must be updated in the event of significant changes to the installation and at least every seven years.
- A professional AWK provides legal certainty and can, at the same time, help to optimise processes and costs.
What is a waste management plan?
A waste management plan is a planning and documentation tool for operational waste management. It describes what types of waste are generated at a facility, how they are collected, treated, recovered and disposed of, and what organisational measures have been put in place to ensure compliance with waste legislation.
The AWK does not merely serve to meet legal requirements. It provides transparency regarding operational waste streams and forms the basis for the sustainable and cost-effective organisation of waste management.
When is a waste management plan mandatory?
Under Section 10 of the Waste Management Act 2002 (AWG 2002), a waste management plan must be drawn up for facilities where waste is generated during operations and which employ more than 20 staff members. The plan must be in place within twelve months of the start of operations or of the 21st staff member being employed.
Furthermore, an AWK may also be required as part of an authorisation procedure, for example when a plant is being constructed, commissioned or substantially modified.
Even organisations with no legal obligation to do so can benefit from an AWK, for example to organise waste streams more effectively, define responsibilities and identify potential savings.
WWhat must a waste management plan include?
The minimum requirements for a waste management plan are laid down by law. In particular, the plan must include the following points:
- Details of the sector, the purpose of the investment and all components of the investment
- a process-based overview of the plant’s operations
- a waste management overview of the business
- organisational measures to ensure compliance with waste management legislation
- an assessment of the future development of the plant and waste management
In practice, this involves documenting, amongst other things, types of waste, quantities of waste, collection and disposal routes, and operational responsibilities.
WHow often does an AWK need to be updated?
A waste management plan is not a one-off document. It must be updated whenever there are significant changes to the facility that affect waste management. Irrespective of this, an update is required at least every seven years.
The proposal must be submitted to the relevant authority upon request. If the authority identifies any errors or omissions, it may require the proposal to be revised.
What are the benefits of a waste management plan?
A professionally prepared AWK offers companies far more than simply compliance with legal requirements.
- Greater legal certainty: An up-to-date and comprehensive policy helps businesses to document their obligations under waste legislation in a transparent manner and to be prepared for regulatory inspections.
- Transparent waste streams: The systematic recording of waste types, quantities and disposal methods provides a clear overview of the organisation’s waste management.
- Optimisation of processes and costs: By analysing existing processes, it is possible to identify opportunities for waste prevention, improved sorting and more efficient disposal.
- Support for environmental and sustainability objectives: An AWK helps companies to use their resources more consciously and to further develop their circular economy.
This is how Interzero can help you draw up your waste management plan
Interzero supports businesses in drawing up, updating and optimising waste management plans throughout Austria. Depending on requirements, this is carried out through an on-site inspection, on the basis of existing documentation, or as early as the planning phase of a new site.
The services include, amongst other things:
- Analysis of operational processes and waste streams
- Survey of waste types and quantities
- Documentation in accordance with Section 10 of the AWG 2002
- Assessment of potential for optimisation and recommendations for action
- Support with the implementation of recommended measures
Would you like to check whether a waste management plan is required for your facility, or do you need assistance with drawing up or updating your waste management plan?